Arlington Wind Energy Center
845-MW

Third largest wind farm in the U.S.   

This 845-MW wind project spans more than 30 miles in the Pacific Northwest United States. Blattner began construction on the multi-year project in 2009 and was completed in 2012.

As the EPC contractor for the project, Blattner’s scope of work included construction of access roads, installation of turbines and foundations, collection systems, transmission line, and construction of three substations, one ring bus, three O&M buildings and nine permanent MET towers.

Partner With Us
BE

Achievements: Clean Energy Power.

  • third largest wind farm in the US and one of the largest in the world at that time
  • production capability of 2 billion kilowatt hours of electricity
  • distance of 30 miles between the farthest north to the farthest south turbines